top of page

Repair Hangar Door 1 and Heat, Barksdale AFB

 

CONTRACT NUMBER: FA4608-17-C0010  $5,751,947.51

Complete demolition and rebuilding of 20 each 70’X40’ foot hangar doors, removal and disposal of 2 every 70 ft. hangar doors via crane, reconfiguration of door operation and aperture’s, new; motors, cables, tracks, extensive welding, and metalwork, new upper rollers, all new windows, complex electrical configurations, limit switches, safety devices & controls, extensive concrete & rail replacement work (450 cy yards), drain cleaning (Plumbing) & scoping, to include any necessary pipe replacement, HVAC & Mechanical, lead paint removal, bond blasting, interior and exterior painting, environmental requirements, air quality testing, concrete testing. The facility was occupied and phasing was required for each bay of the hangar.  The project required extensive security checks, using activity coordination and flight line badges and access due to occupied hangar with B52 maintenance.

© 2019 by Stephens Construction. Proudly created with Wix.com

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle

CONTACT

Inquiries

For any inquiries, questions or commendations, please call: 334-335-3800  or fill out the following form

Thanks for submitting!

Office

99 Ag Mart Drive

Luverne, Alabama 36049

 

stephenscc00@gmail.com

Tel: 334-335-3800

Fax: 334-335-4310

bottom of page